OIL & GAS

HOME / Projects / OIL & GAS

The U.A.E. is estimated to hold the world’s seventh-largest proved oil reserves, equivalent to 97.8 billion barrels and the natural gas sector utilizes the country’s 215 trillion cubic feet (Tcf) of proved natural gas reserves, the world’s seventh-largest.

The U.A.E.’s domestic O&G sector notably includes multiple national oil companies, as well as Mubadala Petroleum, a wholly-owned subsidiary of the Government of Abu Dhabi’s Mubadala Investment Company, and the privately-owned Crescent Group, the Middle East’s oldest and largest private O&G firm. The U.A.E.’s NOC’s include the biggest local player, the Abu Dhabi National Oil Company (ADNOC), one of the world’s largest oil and gas producers; the Emirates National Oil Company (ENOC), Dubai’s NOC; Sharjah National Oil Company (SNOC); and RAK Gas, of Ras al Khaimah

ELITE team of engineers and designers are having UAE experience and are completely familiar with national oil companies’ codes and standards, they spent most of their professional life in UAE and successfully completed various projects for national oil companies, EPC’s & Engineering Consultants.

Our Projects

Sl No Project Description Client Year
1Topographical survey of hydrocarbon remediation Study aria at Buhasa. Preparing topographic drawings of the hydrocarbon remediation study area at Buhasa.URS CORPORATION2022
2Setting out survey of proposed 48” water pipeline at Umm Al Nar Refinery.TOLEDO ELECCTRO MACHANICAL ENGINEERING2022
3Equipment hiring,Setting out and levelling work, FujairahBSS Technologies,ABU DHABI2021
43D scanning, Column Aliglnment and levelling at Bab plantROBTSTONE LLC2020
5Setting out and Underground Utility Survey at ADNOC Oil field in Ruwais.(Project details:PU-20-0069-AD-IRAMP-RUWAIS)FUGRO MIDDLE EAST LTD.2020
6Topographical Survey and Underground Utility Survey at ADNOC Oil field in ASAB and .(Project details:PU-21-0003-ADL-MEI)FUGRO MIDDLE EAST LTD.2020
7Equipment hiring.FUGRO MIDDLE EAST LTD.2020
8TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY FOR ASAB FFD PHASE II STAGE-I PROJECTHORIZONS UNION2019
9REINFORCED THERMO PLASTIC PIPE(RTP) PROJECT - SHAH GAS FIELDS HORIZONS UNION2018
10TOPOGRAPHIC SURVEY FOR AL KHRAIR EMIRATI HOUSING DEVELOPMENTHORIZONS UNION2018
11Irrigation Main Network & PS of Irrigation Network Project & update of GIS data and gape analysis as per ADDC standardHORIZONS UNION2018
12Al Ain Distribution Company (AADC) - Survey and Verification of TSE network c & update of GIS data and gape analysis Projet as per AADC standardHORIZONS UNION2018
13TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY AT BAB FIELDHORIZONS UNION2018
14TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEYHORIZONS UNION2018
15Topographic survey and magnetic survey at CICPA Gate AL ASHFAA TRANSPORT2018
16Setting out of Radar Cemara positions at miltary base Al RuwaisUPG SURVEYING2018
17HIRING OF SURVEYOR AND EQUIPMENTSHORIZONS UNION2017
18HIRING OF SURVEYOR AND EQUIPMENTSHORIZONS UNION2017
19Road Construction Survey Support Services for EPC for Mender Field Dev. Phase-IHORIZONS UNION2017
20Topographic Survey for Replacement of GAS metering Skid & Enhancement of flow control .HORIZONS UNION2017
21Topographic & Underground utilities survey, report & Drawing preparation service. HORIZONS UNION2017
22GEOTECHNICAL INVESTIGATION SERVICES FOR CHILLED WATER PIPING & ETS WORKS TO CONNECT QASR AL HOSNHORIZONS UNION2017
23TOPOGRAPHIC SURVEY AND UNDERGROUND DETECTION FOR ADDITIONAL COLD STORAGE FACILITIES AT DAS ISLAND HORIZONS UNION2017
24TOPOGRAPHIC SURVEY FOR NEW PROPOSED WELHEADS - AL DABBYIA DEVELOPMENT PHASE IIIHORIZONS UNION2017
25DETAILED SURVEY FOR EXISTED CLUSTERS - AL DABBYIA DEVELOPMENT PHASE IIIHORIZONS UNION2017
26survey data QA/QC and create of GDB for IGD -E pipeline (6" & 42" ) as per GASCO Standard and Specification for GIS DatabasesHORIZONS UNION2017
27Topographic Survey for EPC for Mender Field Dev. Phase-IHORIZONS UNION2016
28Topographical & Underground Survey of Gas Pipeline Centerline Data Verification & Field SurveyHORIZONS UNION2016
29TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY FOR OGD-1 TRUNKLINES REPLACEMENT PROJECTHORIZONS UNION2016
30TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY AT ASABHORIZONS UNION2016
31Topographical & Magnetic Detection Survey for all proposed HV, LV & FO Cables proposed under Project Scope in BAB, Bu Hasa, ASAB and SHAH Fields.HORIZONS UNION2015
32Topographic, Geotechnical and Under Ground Magnetic Detection Survey for all Water Injection Clusters, Gas Stations and Trunkline/Flowline Networks under Project SOW.HORIZONS UNION2015
33Geotechnical Survey works for all proposed 33Kv Overhead Transmission Line for Mender Field Development Project.HORIZONS UNION2015
34Topographic and Under Ground Magnetic Detection Survey works for Flowline Construction works of Bb-1073 (AP-03) Gasline and Re-routing of Bb-487/488HORIZONS UNION2015
35Topographical & Underground Survey of Gas Pipeline Centerline Data Verification & Field SurveyHORIZONS UNION2015
36Topographic and Magnetic Detection Survey works (Every 10m Intervals within 100m corridor width) for 28 Wellhead Flowlines, Topographic Survey for Bb-1002 within 100m corridor width and Isolation Valve stations having an area of 2500 m2 (50m x 50m). - BABHORIZONS UNION2015
37Topographic and Under Ground Magnetic Detection Survey works (Every 10m Intervals within 50m corridor width) for Water Injection Wellhead Flowlines, BAB CDS Area and Water Inection Clusters No. 05, 15 & 16.HORIZONS UNION2015
38Topographic and Underground SurveyHORIZONS UNION2014
39Topographic & Underground Magnetic Survey works for the Engineering Services of the new Main Oil Line No.3 (MOL-3) From ADCO BAB Central Degassing Station (BCDS) up to MP-21 Station with total length of 33 KM along with partial survey and geotechnical invHORIZONS UNION2013
40Topographic & Underground Magnetic Survey works for the EPC of Nitrogen Gas Injection (Pure Gas) at BAB. Topographical & U/G Magnetic Survey for 14 Gas flowlines / Trunklines along with 7 Gas stations within 50 m corridor width for ADCO HABSHAN FIELDHORIZONS UNION2013
41Topographic & Underground Detection Survey for 12 Nos. Well Head and Flowlines at Asab and HabshanHORIZONS UNION2013
42Preparation of Survey Alignment Sheets and Final Survey ReportsHORIZONS UNION2012
43Geotechnical Survey works for the Engineering Services of OGD-I Trunkline Replacement and successfully completed the work for 9 Proposed Gas Trunk Lines in OGD-I of total 130 KM length as well as respective launchers and receiver stations for ADCO HABSHANHORIZONS UNION2012
44Topographic & Underground Magnetic Survey works for the Engineering Services of OGD-I Trunkline Replacement and Rehabilitation of OGD-III Flowlines and successfully completed the work for 9 Proposed Gas Trunk Lines in OGD-I of total 130 KM length as well HORIZONS UNION2012
45Topographic & Underground Magnetic Survey works (Every 5M Intervals within 25m corridor width) for the well / flow line of well no. Bb-370 - BAB FieldHORIZONS UNION2011
46Topographic & Underground Magnetic Survey works (Every 10M Intervals within 25m corridor width) for the flow line of well no. Bb-475 (OGDII) BAB FieldHORIZONS UNION2010
47Topographic & Underground Magnetic Survey works (Every 5M Intervals within 50m corridor) for the flow lines of 12 Gas Wells (74 KM) at BAB FieldHORIZONS UNION2010
48Tropographic survey of Zirku Island Airport Runway and preparing drawingWD ARMSTRONG2010
49Topographic survey at different fields of ADCO to support the supply of Pig Launchers & Receivers to 18 fields.GALFAR ENGINEERING2010
50Construction survey of three compression stations at BAB Drawing preparation for Ruwais site. GALFAR ENGINEERING2008
51Topographic survey of EPC for closed drain system for old RDS1 -5 at BAB . Contract No. 6975.01 / EC10694.GALFAR ENGINEERING2008
52Pipeline corridor topo survey in Fujaira, SURTECH INTERNATIONAL2008
53Establishing Survey control markers along the proposed pipeline route (69 Km) in FujairaSURTECH INTERNATIONAL2008
54Setting out and topographic survey along the proposed water pipeline route in Fujairah.SURTECH INTERNATIONAL2008
55Verification of position of rig Ensco 84 at AS-A-B.HORIZONE SURVEY CO.2007
56 Ensco84Rig positioning survey, location survey stations.HORIZONE SURVEY CO.2007
57Verification of dimensions of off shore structures at Qatar Offshore.N P C C2007
58Checking of setting out points and checking for position. Checking setting out breakwater and under water boundary wall level checking. Setting out of 48” Gas and Crude Oil Pipeline from section 1 to 20.AL AREEJ2007
59Topographic survey AL DHAFRA TERMOL2006
60Construction survey of wash water header replacement and produced water re injection pilot project at Bab Contract No. 6798.01 / EC10678GALFAR ENGINEERING2006
61Hiring of Surveyor with total station for ADCO multiphase flow meter project RuwaisGALFAR ENGINEERING2006
62Setting out Housing complex project in Ruwais drawing and coordinate setting.TAHSAJEER GARDENS2006
63Setting out of bore hole, cpt and ERT for TAKREER at various locations in abu DhabiSWISS BORING2006
64Topographic survey and setting out works for RRE in Abu Dhabi.SWISS BORING2006
65Asbuilt survey of ADCO proposed GIPP pipeline laid and well head prepared at Asab. ADCO proposed loop 3 route marking at Habshan.GALFAR ENGINEERING2005
66 ADCO proposed water injection pipeline route marking at Habshan.GALFAR ENGINEERING2005
67 Control station establishment and setting out survey for proposed installation of well head facilities and flow lines at Bb 615 & tie Bb 383 at ADCO Habshan. Prepare of Profile drawing, topographic work at Gasco and Habshan.GALFAR ENGINEERING2005
68OPIC 18” Gas pipeline route & ROW survey from Fahud to Sohar (225km) parallel to the existing 32” gas line. Preparing route survey and profile drawing.IBN KHALDUNALMADAAEN ENGINEERING CONSULTANTS2005
69ADCO proposed GIPP route line marking 12 km at Asab. ADCO proposed GIPP well head area foundation and fence marking at Asab.GALFAR ENGINEERING2004
70Route survey & topographical survey along the proposed 24” Pipeline to Umm Al Nar from Al Maqta gas terminal.MARTIN MID EAST2004
71Route survey & Topographical survey along the proposed 48” onshore pipeline route from DEL Gas receiving facilities to proposed tie-in point with existing 48” pipeline system.MARTIN MID EAST2004
72DEL proposed gas receiving facility area topographical survey at Maqta.MARTIN MID EAST2004
73 DEL proposed gas receiving facility area topographical survey at Al Ain. MARTIN MID EAST2004
74Verification of position and levelness of production platform and Living Quarter platform at Al Kara Kara in Qatar offshore for QPD. Verification of bearing and rig access survey at Maersk Qatar Oilfield at Al Shaheen A, B, C, D, E and F P form.HORIZONE SURVEY CO.

Our Certificates

Copyrights © 2022 All Rights Reserved by Elite LLC