Sl No
|
Project Description
|
Client
|
Year
|
1 | Topographical survey of hydrocarbon remediation Study aria at Buhasa. Preparing topographic drawings of the hydrocarbon remediation study area at Buhasa. | URS CORPORATION | 2022 |
2 | Setting out survey of proposed 48” water pipeline at Umm Al Nar Refinery. | TOLEDO ELECCTRO MACHANICAL ENGINEERING | 2022 |
3 | Equipment hiring,Setting out and levelling work, Fujairah | BSS Technologies,ABU DHABI | 2021 |
4 | 3D scanning, Column Aliglnment and levelling at Bab plant | ROBTSTONE LLC | 2020 |
5 | Setting out and Underground Utility Survey at ADNOC Oil field in Ruwais.(Project details:PU-20-0069-AD-IRAMP-RUWAIS) | FUGRO MIDDLE EAST LTD. | 2020 |
6 | Topographical Survey and Underground Utility Survey at ADNOC Oil field in ASAB and .(Project details:PU-21-0003-ADL-MEI) | FUGRO MIDDLE EAST LTD. | 2020 |
7 | Equipment hiring. | FUGRO MIDDLE EAST LTD. | 2020 |
8 | TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY FOR ASAB FFD PHASE II STAGE-I PROJECT | HORIZONS UNION | 2019 |
9 | REINFORCED THERMO PLASTIC PIPE(RTP) PROJECT - SHAH GAS FIELDS | HORIZONS UNION | 2018 |
10 | TOPOGRAPHIC SURVEY FOR AL KHRAIR EMIRATI HOUSING DEVELOPMENT | HORIZONS UNION | 2018 |
11 | Irrigation Main Network & PS of Irrigation Network Project & update of GIS data and gape analysis as per ADDC standard | HORIZONS UNION | 2018 |
12 | Al Ain Distribution Company (AADC) - Survey and Verification of TSE network c & update of GIS data and gape analysis Projet as per AADC standard | HORIZONS UNION | 2018 |
13 | TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY AT BAB FIELD | HORIZONS UNION | 2018 |
14 | TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY | HORIZONS UNION | 2018 |
15 | Topographic survey and magnetic survey at CICPA Gate | AL ASHFAA TRANSPORT | 2018 |
16 | Setting out of Radar Cemara positions at miltary base Al Ruwais | UPG SURVEYING | 2018 |
17 | HIRING OF SURVEYOR AND EQUIPMENTS | HORIZONS UNION | 2017 |
18 | HIRING OF SURVEYOR AND EQUIPMENTS | HORIZONS UNION | 2017 |
19 | Road Construction Survey Support Services for EPC for Mender Field Dev. Phase-I | HORIZONS UNION | 2017 |
20 | Topographic Survey for Replacement of GAS metering Skid & Enhancement of flow control . | HORIZONS UNION | 2017 |
21 | Topographic & Underground utilities survey, report & Drawing preparation service. | HORIZONS UNION | 2017 |
22 | GEOTECHNICAL INVESTIGATION SERVICES FOR CHILLED WATER PIPING & ETS WORKS TO CONNECT QASR AL HOSN | HORIZONS UNION | 2017 |
23 | TOPOGRAPHIC SURVEY AND UNDERGROUND DETECTION FOR ADDITIONAL COLD STORAGE FACILITIES AT DAS ISLAND | HORIZONS UNION | 2017 |
24 | TOPOGRAPHIC SURVEY FOR NEW PROPOSED WELHEADS - AL DABBYIA DEVELOPMENT PHASE III | HORIZONS UNION | 2017 |
25 | DETAILED SURVEY FOR EXISTED CLUSTERS - AL DABBYIA DEVELOPMENT PHASE III | HORIZONS UNION | 2017 |
26 | survey data QA/QC and create of GDB for IGD -E pipeline (6" & 42" ) as per GASCO Standard and Specification for GIS Databases | HORIZONS UNION | 2017 |
27 | Topographic Survey for EPC for Mender Field Dev. Phase-I | HORIZONS UNION | 2016 |
28 | Topographical & Underground Survey of Gas Pipeline Centerline Data Verification & Field Survey | HORIZONS UNION | 2016 |
29 | TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY FOR OGD-1 TRUNKLINES REPLACEMENT PROJECT | HORIZONS UNION | 2016 |
30 | TOPOGRAPHICAL & UNDERGROUND DETECTION SURVEY AT ASAB | HORIZONS UNION | 2016 |
31 | Topographical & Magnetic Detection Survey for all proposed HV, LV & FO Cables proposed under Project Scope in BAB, Bu Hasa, ASAB and SHAH Fields. | HORIZONS UNION | 2015 |
32 | Topographic, Geotechnical and Under Ground Magnetic Detection Survey for all Water Injection Clusters, Gas Stations and Trunkline/Flowline Networks under Project SOW. | HORIZONS UNION | 2015 |
33 | Geotechnical Survey works for all proposed 33Kv Overhead Transmission Line for Mender Field Development Project. | HORIZONS UNION | 2015 |
34 | Topographic and Under Ground Magnetic Detection Survey works for Flowline Construction works of Bb-1073 (AP-03) Gasline and Re-routing of Bb-487/488 | HORIZONS UNION | 2015 |
35 | Topographical & Underground Survey of Gas Pipeline Centerline Data Verification & Field Survey | HORIZONS UNION | 2015 |
36 | Topographic and Magnetic Detection Survey works (Every 10m Intervals within 100m corridor width) for 28 Wellhead Flowlines, Topographic Survey for Bb-1002 within 100m corridor width and Isolation Valve stations having an area of 2500 m2 (50m x 50m). - BAB | HORIZONS UNION | 2015 |
37 | Topographic and Under Ground Magnetic Detection Survey works (Every 10m Intervals within 50m corridor width) for Water Injection Wellhead Flowlines, BAB CDS Area and Water Inection Clusters No. 05, 15 & 16. | HORIZONS UNION | 2015 |
38 | Topographic and Underground Survey | HORIZONS UNION | 2014 |
39 | Topographic & Underground Magnetic Survey works for the Engineering Services of the new Main Oil Line No.3 (MOL-3) From ADCO BAB Central Degassing Station (BCDS) up to MP-21 Station with total length of 33 KM along with partial survey and geotechnical inv | HORIZONS UNION | 2013 |
40 | Topographic & Underground Magnetic Survey works for the EPC of Nitrogen Gas Injection (Pure Gas) at BAB. Topographical & U/G Magnetic Survey for 14 Gas flowlines / Trunklines along with 7 Gas stations within 50 m corridor width for ADCO HABSHAN FIELD | HORIZONS UNION | 2013 |
41 | Topographic & Underground Detection Survey for 12 Nos. Well Head and Flowlines at Asab and Habshan | HORIZONS UNION | 2013 |
42 | Preparation of Survey Alignment Sheets and Final Survey Reports | HORIZONS UNION | 2012 |
43 | Geotechnical Survey works for the Engineering Services of OGD-I Trunkline Replacement and successfully completed the work for 9 Proposed Gas Trunk Lines in OGD-I of total 130 KM length as well as respective launchers and receiver stations for ADCO HABSHAN | HORIZONS UNION | 2012 |
44 | Topographic & Underground Magnetic Survey works for the Engineering Services of OGD-I Trunkline Replacement and Rehabilitation of OGD-III Flowlines and successfully completed the work for 9 Proposed Gas Trunk Lines in OGD-I of total 130 KM length as well | HORIZONS UNION | 2012 |
45 | Topographic & Underground Magnetic Survey works (Every 5M Intervals within 25m corridor width) for the well / flow line of well no. Bb-370 - BAB Field | HORIZONS UNION | 2011 |
46 | Topographic & Underground Magnetic Survey works (Every 10M Intervals within 25m corridor width) for the flow line of well no. Bb-475 (OGDII) BAB Field | HORIZONS UNION | 2010 |
47 | Topographic & Underground Magnetic Survey works (Every 5M Intervals within 50m corridor) for the flow lines of 12 Gas Wells (74 KM) at BAB Field | HORIZONS UNION | 2010 |
48 | Tropographic survey of Zirku Island Airport Runway and preparing drawing | WD ARMSTRONG | 2010 |
49 | Topographic survey at different fields of ADCO to support the supply of Pig Launchers & Receivers to 18 fields. | GALFAR ENGINEERING | 2010 |
50 | Construction survey of three compression stations at BAB Drawing preparation for Ruwais site. | GALFAR ENGINEERING | 2008 |
51 | Topographic survey of EPC for closed drain system for old RDS1 -5 at BAB . Contract No. 6975.01 / EC10694. | GALFAR ENGINEERING | 2008 |
52 | Pipeline corridor topo survey in Fujaira, | SURTECH INTERNATIONAL | 2008 |
53 | Establishing Survey control markers along the proposed pipeline route (69 Km) in Fujaira | SURTECH INTERNATIONAL | 2008 |
54 | Setting out and topographic survey along the proposed water pipeline route in Fujairah. | SURTECH INTERNATIONAL | 2008 |
55 | Verification of position of rig Ensco 84 at AS-A-B. | HORIZONE SURVEY CO. | 2007 |
56 | Ensco84Rig positioning survey, location survey stations. | HORIZONE SURVEY CO. | 2007 |
57 | Verification of dimensions of off shore structures at Qatar Offshore. | N P C C | 2007 |
58 | Checking of setting out points and checking for position. Checking setting out breakwater and under water boundary wall level checking. Setting out of 48” Gas and Crude Oil Pipeline from section 1 to 20. | AL AREEJ | 2007 |
59 | Topographic survey | AL DHAFRA TERMOL | 2006 |
60 | Construction survey of wash water header replacement and produced water re injection pilot project at Bab Contract No. 6798.01 / EC10678 | GALFAR ENGINEERING | 2006 |
61 | Hiring of Surveyor with total station for ADCO multiphase flow meter project Ruwais | GALFAR ENGINEERING | 2006 |
62 | Setting out Housing complex project in Ruwais drawing and coordinate setting. | TAHSAJEER GARDENS | 2006 |
63 | Setting out of bore hole, cpt and ERT for TAKREER at various locations in abu Dhabi | SWISS BORING | 2006 |
64 | Topographic survey and setting out works for RRE in Abu Dhabi. | SWISS BORING | 2006 |
65 | Asbuilt survey of ADCO proposed GIPP pipeline laid and well head prepared at Asab. ADCO proposed loop 3 route marking at Habshan. | GALFAR ENGINEERING | 2005 |
66 | ADCO proposed water injection pipeline route marking at Habshan. | GALFAR ENGINEERING | 2005 |
67 | Control station establishment and setting out survey for proposed installation of well head facilities and flow lines at Bb 615 & tie Bb 383 at ADCO Habshan. Prepare of Profile drawing, topographic work at Gasco and Habshan. | GALFAR ENGINEERING | 2005 |
68 | OPIC 18” Gas pipeline route & ROW survey from Fahud to Sohar (225km) parallel to the existing 32” gas line. Preparing route survey and profile drawing. | IBN KHALDUNALMADAAEN ENGINEERING CONSULTANTS | 2005 |
69 | ADCO proposed GIPP route line marking 12 km at Asab. ADCO proposed GIPP well head area foundation and fence marking at Asab. | GALFAR ENGINEERING | 2004 |
70 | Route survey & topographical survey along the proposed 24” Pipeline to Umm Al Nar from Al Maqta gas terminal. | MARTIN MID EAST | 2004 |
71 | Route survey & Topographical survey along the proposed 48” onshore pipeline route from DEL Gas receiving facilities to proposed tie-in point with existing 48” pipeline system. | MARTIN MID EAST | 2004 |
72 | DEL proposed gas receiving facility area topographical survey at Maqta. | MARTIN MID EAST | 2004 |
73 | DEL proposed gas receiving facility area topographical survey at Al Ain. | MARTIN MID EAST | 2004 |
74 | Verification of position and levelness of production platform and Living Quarter platform at Al Kara Kara in Qatar offshore for QPD. Verification of bearing and rig access survey at Maersk Qatar Oilfield at Al Shaheen A, B, C, D, E and F P form. | HORIZONE SURVEY CO. | |